CS615 – Software Project Management Quiz 2 Solution

In this post, we provide correct and updated cs615 software project management quiz 2 solution that help virtual university students in midterm examination and quiz preparation. Students of this subject can prepare this quiz for online test and interview exams.

VU Highlighted Handouts

VU Midterm Past Papers by Moaaz, Waqar and Junaid

Software Project Management – CS615 Quiz 2 Solution

Question 1

The model serves as the basis for the creation of ________ for the Software.

  1. Testing
  2. Specifications
  3. Maintenance
  4. Design

Correct Answer: Specifications

Question 2

A baseline version __________

  1. Have a short life
  2. Can be assigned version numbers 3.2
  3. Survive only during bug fixing
  4. Tested and certified version of a system

Correct Answer: Tested and certified version of a system

Question 3

Software requirements engineering is a process of all except

  1. Refinement
  2. Discovery
  3. Specification
  4. Design

Correct Answer: Design

Question 4

The British Standards Institution (1986) has stated the quality as

  1. The ability of a product to improve user experience
  2. The ability of a software product to satisfy its specified requirements
  3. “Quality is in the eye of the beholder, a matter, of the client’s judgment.”
  4. “An inherent or distinguishing characteristic or a property”

Correct Answer: “Quality is in the eye of the beholder, a matter, of the client’s judgment.”

Question 5

The overall role of Software in a larger system is identified during

  1. Requirements Elicitation
  2. Requirements engineering
  3. Process engineering
  4. System engineering

Correct Answer: System engineering

Question 6

The US DOD (1988) defines software quality rather simply as

  1. The ability of a product to improve user experience
  2. The ability of a software product to satisfy its specified requirements
  3. “An inherent or distinguishing characteristic or a property”
  4. “Quality is in the eye of the beholder, a matter, of the client’s judgment.”

Correct Answer: The ability of a software product to satisfy its specified requirements

Question 7

Product quality depends on its conformance to ______

  1. Development standards
  2. Implicit requirements
  3. All of given
  4. Software requirements

Correct Answer: All of given

Question 8

Cognitive model describes a system as perceived by its _________

  1. Manager
  2. User community
  3. Top level management
  4. Developer

Correct Answer: User community

Question 9

Requirements are refined and analyzed to assess their clarity, completeness, and_______

  1. Concurrency
  2. Preciseness
  3. Correctness
  4. Consistency

Correct Answer: Consistency

Question 10

Once the review is complete, the Software Requirements Specification is “signed-off by _________

  1. Both customer and developer
  2. Developer
  3. Customer
  4. Top level management

Correct Answer: Both customer and developer

Question 11

Throughout evaluation and solution synthesis, the analyst’s primary focus is on

  1. “What, not “how”
  2. Specification
  3. Evaluation and Synthesis
  4. Model

Correct Answer: “What, not “how”

Question 12

All of the following are benefits of meeting quality requirements

  1. Less rework
  2. An increase in stakeholder satisfaction
  3. Low turnover
  4. Higher productivity

Correct Answer: Less rework

Question 13

The quality of software is said to be high if it meets the

  1. Procedures, defined for the product
  2. Standards, defined for the product
  3. Design defined for product
  4. Standards and procedures, defined for the product

Correct Answer: Standards and procedures, defined for the product

Question 14

The model serves as a foundation for software _____

  1. Maintenance
  2. Design
  3. Specifications
  4. Testing

Correct Answer: Design

Question 15

The overall role of Software in a larger system is identified during

  1. Requirements engineering
  2. Requirements Elicitation
  3. System engineering
  4. Process engineering

Correct Answer: System engineering

Question 16

Configuration control tools include_________

  1. Change control tools
  2. All of given
  3. Automatic version control
  4. Monitoring, auditing and registration support utilities

Correct Answer: All of given

Question 17

A meeting is conducted at a _________ and attended by both software engineers and customers.

  1. Company site
  2. Neutral site
  3. Software engineer site
  4. Customer site

Correct Answer: Neutral site

Question 18

Synchronization control helps to ensure that parallel changes performed by two different people do ___________.

  1. May overwrite one another
  2. Not overwrite one another
  3. Must overwrite one another
  4. Overwrite one another

Correct Answer: Not overwrite one another

Question 19

A baseline version __________

  1. Have a short life
  2. Tested and certified version of a system
  3. Survive only during bug fixing
  4. Can be assigned version numbers 3.2

Correct Answer: Tested and certified version of a system

Conclusion

The topic of this post is providing software project management quiz 2 solution that help in quiz and test preparation.